The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the Harbor Bay Isle Lagoon stormwater control system including all demolition work including handling and legal disposal of lead containing materials, structural concrete repair and new concrete work, coating of concrete surfaces, new chain link fencing, new galvanized grating, installation of a new owner-furnished gate actuator, new level control instruments, installation of owner-furnished electrical enclosures and controls, all electrical improvements, testing, site restoration, temporary controls, and all other work as shown on the Plans and as called for in the Special Provisions and as directed by the Engineer.
Addendum 1 (click to expand/collapse)
Name Size
addendum1 167.3 KB
Addendum 2 (click to expand/collapse)
Name Size
addendum2 238.9 KB