Clement Avenue Safety Improvements Projects
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing the railroad tracks and ties, resurfacing, cold plane and pavement overlay, cycletrack installation, re-striping, sidewalk ADA improvements, including mobilization, demobilization, Water Pollution Control Plan (WPCP), traffic controls, debris and pollutant containment, permits, clean-up and all other associated work and incidentals required to complete the project as designated in the plans.
    
    
    
    
    
    
    
            
                                                Attachments
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| ATTACHMENTS - 2023-08-15_Clement | 20.2 MB | 
                                                Project Manual
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| 2023-08-04_Clement-IFB Project Manual | 1.1 MB | 
                                                Specifications
                 (click to expand/collapse)
 (click to expand/collapse)
            
             (click to expand/collapse)
 (click to expand/collapse)
            | Name | Size | ||
| TECHNICAL SPECS - 2023-08-04_Clement | 1.8 MB | 
