Alameda Point Reuse Area Replacement Infrastructure

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing utility (storm drain, sanitary sewer, water, electrical, natural gas, telecom, etc.) systems, utility services, street lighting, curb, gutter, sidewalk, driveway, street paving, landscape and irrigation, SWPPP, Site Management Plan compliance, traffic controls, and any associated work necessary for Project completion at the plant-designated locations.
Addendum 1 (click to expand/collapse)
Name Size
Addendum1 862.1 KB
Addendum 2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum2 225.7 KB
Addendum2_BidPurposesOnly.zip 9.9 MB
Addendum 3 (click to expand/collapse)
Name Size
Addendum3 432.3 KB
Addendum 4 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum4 733.3 KB
Exhibit A_RevisedIrrigationPlanSet011122 22.4 MB
ExhibitB_Addend4_Geotechnical References.zip 30.3 MB
Addendum 5 (click to expand/collapse)
Name Size
Addendum5 242.7 KB
Q&A (click to expand/collapse)
Name Size
QuestionsAndAnswersDuringBidPeriod012122 3.4 MB