Alameda Point Reuse Area Replacement Infrastructure
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with removing and installing utility (storm drain, sanitary sewer, water, electrical, natural gas, telecom, etc.) systems, utility services, street lighting, curb, gutter, sidewalk, driveway, street paving, landscape and irrigation, SWPPP, Site Management Plan compliance, traffic controls, and any associated work necessary for Project completion at the plant-designated locations.
Status
Bidding Closed
Bid Date | 1/25/22 2:30pm |
Company & Contacts
City of Alameda
Erin Smith
510-747-7938, esmith@alamedaca.gov
Location
City of Alameda
BIDS DUE BY: TUESDAY, JANUARY 25TH, 2022 @ 2:30 PM