Pavement Management Project Phase 42

Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with hot mix asphalt inlays, cold plane asphalt concrete overlays, wedge cut, crack seal, slurry seal, drainage improvements, and pavement striping.
Addendum 1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
01_Alameda-Phase 42_Final Plans_20240226 FINAL PLANS 137.3 MB
addendumNo1.docx SIGNED 374.4 KB