Pavement Management Project Phase 42
Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with hot mix asphalt inlays, cold plane asphalt concrete overlays, wedge cut, crack seal, slurry seal, drainage improvements, and pavement striping.
Addendum 1
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | |||
| 01_Alameda-Phase 42_Final Plans_20240226 FINAL PLANS | 137.3 MB | |||
| addendumNo1.docx SIGNED | 374.4 KB |
