City of Alameda Pavement Management Project, Phase 43

The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with hot mix asphalt inlays, cold milling asphalt pavement, base repair, crack seal, slurry seal, rubberized chip seal, microsurfacing, drainage improvements, curb ramps, and pavement striping.

Status

Accepting Bids

Bid Date 5/27/25 2:00pm

Company & Contacts

City of Alameda
Alan Ta  

Location

Alameda, CA

Documents

Approximate cost of construction: $6,685,000