Clement Avenue/ Tilden Way Improvement Project
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the work to be performed under these specifications. The work to be performed includes, but is not limited to: mobilizing/demobilizing, traffic and pedestrian control, water pollution control, temporary construction staging, construction staking, removal of concrete, asphalt concrete pavement, and base, pavement markings, drainage facilities, fencing, railroad platforms, contaminated material, and railroad track and ties; clearing and grubbing, roadway excavation, adjusting utility covers to grade, concrete improvements including sidewalks, driveways, curb and gutters, and curb ramps; aggregate base, asphalt improvements; installing culverts, storm drains, bioswales, storm drains, sanitary sewers, thermoplastic striping and markings, signs, mulch, landscape planting, trees, irrigation, privacy fence, decomposed granite, park furnishing, traffic signal modification, lighting, and communication system.
Addendum 1
(click to expand/collapse)

Name | Size | |||
ClementTilden_BidAddendumNo1_05122025 | 284.3 KB |