Estuary Park Phase 2 Site Improvements
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the construction and site improvements for Estuary Park Phase 2, the eastern 3.8- acre public park phase of the larger 7.63-acre Estuary Park. (Estuary Park was planned in two almost equally sized phases, Phase 1 being the western four-acre athletic fields-oriented portion of the park completed in 2018.) Planned as an inclusive community park space, the work for Estuary Park Phase 2 includes, but is not limited to: an inclusive children’s playground complete with play equipment, picnic areas with a shade structure and barbecue grills, a prefabricated 6-unit all-gender concrete restroom building*, asphalt paved full court basketball court and Bankshot courts, fenced-in pickleball courts, concrete pathways, open lawn area, large- and small- fenced in dog park areas, planted and mulched landscaped areas, complete with stormwater treatment areas, park and pathway lighting, barrier fences as appropriate, a paved parking area with infrastructure to support future electric vehicle charging stations, a central trash enclosure, drinking fountains, trash, organics, and recycling bins, and bike racks.
Status
Accepting Bids
Prebid Date | 7/21/25 10:30am |
Bid Date | 8/5/25 2:00pm |
Location
Alameda, CA
Approximate cost of construction is estimated at about $6.5 Million.
There is a mandatory on-site Prebid meeting scheduled for this Project on Monday, July 21 2025 at 10:30 am. ALL BIDDERS MUST ATTEND. Prospective bidders will meet at the north entrance to the existing parking lot off Mitchell Avenue. A sign-in sheet will be issued, and shared, to provide a record of attendees.