Alameda Day Center Project
The Project includes, but is not limited to, performing the following Work: Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with renovation of existing office space into new day center and night shelter for displaced community members, consisting of interior renovation of existing space including mechanical, electrical, and plumbing infrastructure, new fire sprinkler and alarm system, replacement of existing sewer lateral, modification of the existing parking and site area, replacement of the existing roof system, and related finishes and
Status
Accepting Bids
Prebid Date | 10/21/25 10:00am |
Bid Date | 11/5/25 2:00pm |
Location
This Project is situated on the following City streets: • W. Midway and Lexington
Approximate cost of construction: $2,400,000.00
There will be a mandatory onsite Pre-bid Meeting and Site Walk scheduled for October 21, 2025 at 10AM. Prospective bidders will meet at 1041 W. Midway Ave., Alameda, CA. A signin sheet will be issued, and shared, to record attendees.