Shell Gate & Willow Outfalls Project
Furnishing all labor, tools, equipment, materials except as herein specified; and doing all work associated with the installation of four grated overflow inlets on four storm outfall pipes and the installation of cured in place pipe on the storm pipe segments between the new overflow inlets and upstream drain inlet. This Project is situated at Crown Memorial Beach in the vicinity of Shell Gate and Willow Roads
Plans
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Shell Gate & Willow Outfalls Bid Set_signed | 9.9 MB |
